Start of demolition work

The demolition work begins The joy is great, because after several years of planning, something is finally happening. The old house at Au 81 is now being demolished from the inside. We decided to carry out the separation of the building mass ourselves with the

Read more »
Construction diary

There goes the roof

The roof is no longer necessary – it can go now After receiving the building permit, the roof of the house is no longer necessary. The company Berner Dach has removed the old Eternit roof and disposed of it in accordance with regulations.

Read more »
Construction diary

The excavator arrives

The excavator arrives – the house leaves The roof is gone – the excavator of the company Nierlich can come. The already pre-dismantled house is disassembled into its final parts. During the demolition, individual parts, such as lines, pipes or floor insulation, are fished out

Read more »
Construction diary

Our little groundbreaking ceremony

The groundbreaking – a bit early but the excitement was just too much already After a good two years of planning, the time has finally come: the old house has been demolished and nothing stands in the way of the construction work – except for

Read more »
Construction diary

The glass foam insulation

The insulation of the floor slab of foam glass Since we wanted to avoid Styrofoam or XPS or Styrodur in our solid wood construction as much as possible, we came across glass foam during our research. Our architect, Karl Lepic, has told us several times

Read more »
Construction diary

The base plate

The floor slab is concreted After spreading the glass foam insulation, the formwork for the floor slab is erected by the Scheutz company. Reinforcement or rebar is placed in the floor slab to strengthen the floor slab. The reinforced or reinforced floor slab is then

Read more »