The base plate

The floor slab is concreted


Once the glass foam insulation has been applied, the formwork for the floor slab is erected by Scheutz. Reinforcement is inserted into the floor slab to reinforce the floor slab. The reinforced floor slab is then filled with concrete and smoothed. Extra 20 cm high walls are then built for the timber walls. The floor slab is covered with bitumen mats and flamed to seal it.